To the central content area

The auditing and certification project of the regulated recyclable waste (waste vehicle)

Absrtact
From January 01, 2009 to December 31, 2010, the Project team FTIS completed 100% for the engine auditing on site of waste motor vehicle, the body Clearance auditing of waste motor vehicle. The Certified engine quantity was 191,436 cars and 262,767 motorcycles. The certified disposal quantity was 189,803 cars and 261,981 motorcycles. The certified body clearance quantity was 103,119,510 kg. The operational processes auditing was divided into 6 categories:”The Collection standards”, “The storage standards”, ”The disposal standards”, “The subsidized qualification inspections”, “The equipment inspections”, and “The working area standards”. There were total 723 unqualified events(the number of Auditing subjects was 56,160times). The average unqualified rate was 1.29 %.All the unqualified events above were improved immediately on site by the requests of the auditing team. The environment safety auditing was divided into 4 categories: “The environmental protection equipment”, “The working area environment and the Pollution prevention of the system”, “The fire-prevention equipment” and “The Personal safety and emergency plans”. There were total 299 unqualified events(the number of Auditing subjects was 45,240 times). The average unqualified rate was 0.66%. All the unqualified events above were improved immediately on site by the requests of the auditing team. For the subsidy of waste motor vehicles for the recycling enterprises in the northern Taiwan, total 6,679,540 NT dollars was deducted because of the unqualified events.
Keyword
Recycling amounts and processing amounts auditing, Body clearance auditing, Factory resident auditing, Subsidy
Open
top